Check my lot

The Fairways at Redhawk, Temecula, CA

Adding an ADU in The Fairways at Redhawk

The Fairways is one of three named sub-associations inside the Redhawk master plan, and that layering matters: you are subject to both the sub-association and the master association, which is two architectural reviews rather than one.

Redhawk lots run around 6,969 square feet at the median, which is tight but not disqualifying — at a 4-foot side and rear setback, a compact pre-approved plan can work. This is exactly the case where the answer depends on your specific parcel.

  • Free
  • No account
  • No phone number
  • Your result first

Aerial: USGS/USDA NAIP

Before you spend

What to know before you spend anything

Two layers of association review. Neither can prohibit an ADU under Government Code section 66315, but both add calendar time.
At a roughly 6,969 sq ft median lot, fit is parcel-specific. Check yours.

The basics

The Fairways at Redhawk at a glance

Built
1991–2017 across Redhawk overall
Homeowners association
Sub-association under the Redhawk master association
Lots
Redhawk median lot is roughly 6,969 sq ft
ZIP
92592
Part of
Redhawk

We publish only what we verified. Lot dimensions vary enough inside a single tract that a neighborhood average would mislead you, so the tool reads your own parcel instead.

Why two The Fairways at Redhawk lots the same size answer differently

Both of these are 7,200 sq ft with the same 40 × 46 ft house, under Temecula's rules. The only difference is the shape, and it changes the answer.

60 ft wide, 120 ft deep

FitsStudio

Buildable after setbacks
2,858 sq ft
Plans that fit
3 of 10

90 ft wide, 80 ft deep

UnlikelyStudio

Buildable after setbacks
2,938 sq ft
Plans that fit
0 of 10

Two made-up lots, but not made-up numbers: the green area, the fit verdicts and the plan counts are computed with Temecula's own 4 ft setback and 6 ft separation by the same functions the lot tool runs on a real parcel. Your lot is not either of these, which is the point — we read yours.

Measure my actual lot

Honest limits

What the geometry check can and cannot tell you

Why three answers, not yes or no

  • Public parcel lines sit 3 to 25 ft from the surveyed boundary.
  • The setback being measured is only 4 ft.
  • When the error bar is wider than the measurement, "yes" is a guess. So: Fits Tight Unlikely

What public data cannot see

  • Easements through the rear yard
  • Slope
  • Sewer or septic capacity
  • Electrical panel capacity
  • Soil conditions

Any one of these can stop a project that passes the geometry check.

On a tight lot, studio needs about 30 by 17 ft of clear space — and staying under 750 sq ft waives impact fees entirely.

Your HOA

The The Fairways at Redhawk association cannot say no

Nearby

Other Temecula neighborhoods

All Temecula ADU rules and plans

See what fits on your The Fairways at Redhawk lot

Free. You see the result before we ask for anything.